Thames Tideway Tunnel, London
Technology Director
- Problem
- Technical problems connected with diaphragm wall construction.
- What he did
- To be written with Graham.
- Result
- To be written with Graham.
Tunnels and infrastructure, building frames, and design-and-build work in the UK and the Middle East.
| Role | Organisation | Sector |
|---|---|---|
| Engineering Lead | Expanded (Laing O'Rourke) | Concrete frames |
| Director of Design & Construction | Vahana Construction | Building |
| Technical Director | WSP | Consultancy |
| Project Director | Lend Lease | Major projects |
| Technology Director | Thames Tideway Tunnel | Tunnelling |
| Chief Engineer & Technology Manager | CH2M Hill | Infrastructure |
| Design Director | Al Naboodah Laing O'Rourke | Middle East |
Projects belong to the teams that delivered them. Each case study sets out Graham's role and the part he owned.
Technology Director
Engineering Lead, Expanded (Laing O'Rourke)
Chief Engineer, Al Naboodah Laing O'Rourke
Independent structural engineer
Tell me what you're working on. I'll come back within one working day.